How value impact status works
Value impact status shows what each step of a process is worth: value for the client, value for the business, or no clear value. Marking every step this way shows where a process can be simplified.
| Status | Use it when | Examples |
|---|---|---|
| Client Value Added | The step improves what the client gets or experiences. | Conduct a client consultation, configure the product for the client |
| Business Value Added | The client doesn't see it, but the business needs it. | Review a contract, update the CRM, approve a budget |
| Waste | It takes time without a clear result for anyone. | Copy the same data into two systems, prepare a report nobody reads |
| N/A | The value isn't decided yet. | Steps in a process still being built |
Marking a step as Waste doesn't mean deleting it straight away. It means asking why the step exists.
Setting a status
- Open the process and switch on Edit mode.
- Open the action step and choose a status in Value Impact Status.
- Click Save changes.

Example: reviewing a process
A 20-step process after marking: 7 steps Client Value Added, 8 Business Value Added, 3 Waste, 2 N/A.
For each Waste step, ask: can it be removed, automated or merged with another step? Does anyone use its result? Can one approval replace three?
Review processes this way when they get long, involve a lot of manual work or keep producing the same complaints.
Value impact and process stage
The two settings answer different questions. Process stage says what role a step plays: Plan, Do, Check or Act. Value impact says what the step is worth. A contract review can be CHECK and Business Value Added. See How process stages work.